Real surfaces. Real restoration.
Drag the handle on each comparison to see the difference. These are recent CABB projects — not stock photography.

Façade Restoration
Three-story office façade in central Florida. Years of mildew and exhaust staining cleared in two service nights using soft-wash methods that protected the painted finish underneath.

Lobby Floor Refinishing
High-traffic resort lobby floor. Stripped, recoated, and burnished overnight so the property opened for guests at 7am the next morning with zero disruption.

Parking Lot Restripe
Anchor retail center in south Georgia. Faded, cracked lines were removed and replaced with fresh ADA-compliant striping and directional arrows over a single weekend so tenants opened Monday to a lot that looked brand new.

Office Suite Repaint
Turnover repaint for a 4,200 sq ft office suite. Patched drywall, primed, and repainted walls and trim after hours — the incoming tenant moved in on schedule the following Monday.

Storefront Pressure Wash
Multi-tenant retail storefront covered in years of grime, cobwebs, and sidewalk staining. Soft-washed glass, frames, and concrete in a single morning before the center opened.

Apartment Turn — Floors & Paint
Full unit turn for a class-B apartment community. Pulled worn carpet, installed luxury vinyl plank, and repainted walls and ceilings in under five days — ready to lease.
